實驗室資訊透明化E系統
教育訓練網路報名系統
環安中心主選單


無標題文件
 

1.Water pollution control

The waste water treatment and recycle system was set up in 2001 at NCTU for treating the waste water discharged from the sanitary sewer and laboratory drainage systems and recycling part of treated water used in toilet.  The average inflow of sanitary waste water in biological treatment system is about 500CMD, the inflow rate of the laboratory waste water in chemical treatment system is about 50 CMD, and the recycle water is about 30 CMD.

back

 




專線: 03-5131314 傳真: 03-5731618 電子郵件: yusim@mail.nctu.edu.tw
版權所有 交通大學環安中心 All Rights Reserved